Aplicable a Apple 15 adaptador tipo C adaptador de audífonos de 3.5 mm cable de audio para teléfono móvil

110 días
$23.925 pedido mín (644 uds)
Producto 5.0
Proveedor 4.0

Variaciones

type-c analog audio single turn (bare line/does not support Apple 15)
Typec to (3.5 type-c) 60W charging, with packaging, blue audio chip
Typec to (3.5mm type-c port) 10W charging, with packaging, blue audio chip

Productos similares a un precio más bajo

Especificaciones del producto
Marca
Cheng Hongshun
Modelo
CHS002
Modelos aplicables
iPhone
Formulario de interfaz
type-c analog audio single turn (bare line/does not support Apple 15), type-c single turn (white, with packagi...
Marca
Cheng Hongshun
Modelo
CHS002
Modelos aplicables
iPhone
Formulario de interfaz
type-c analog audio single turn (bare line/does not support Apple 15), type-c single turn (white, with packagi...
Marca
Cheng Hongshun
Modelo
CHS002
Modelos aplicables
iPhone
Formulario de interfaz
type-c analog audio single turn (bare line/does not support Apple 15), type-c single turn (white, with packagi...
Detalles del producto
El texto en las imágenes se puede traducir
Total